1.Working on drill floor HPU E-STOP circuit.
2.Derrick talkback substation function test.
3. Prepare ESH facilities for BOP PTW application.
4. Push the modificatio progress for DCC HVAC.
5.Contact construction leader to discuss the EC schedule of ADMS.
6. Punch status checking for rotary table.